Owner: City of Irving
Project: Lake Chapman Water Supply Project
Contract Amount: $56,000,000 (Joint Venture Contract Value)
Project Highlights: 33 miles of 72-inch Steel Pipeline; Energy Dissipation Structure; Outfall Structure; Flow Meter Stations
|
|
Owner: City of Dallas
Project: 108-inch Water Transmission Line - Lake Fork to Lake Tawakoni Section Five
Contract Amount: $29,000,000.00
Project Highlights: 1,800 lf of 108" pipe, 6,410 lf of 96" and 84" 400 lf of 168" steel pipe, removal and replacement, 13,000 cy of concrete for interconnect structure, installation of two 168", three 144" and one 108" butterfly valves.
|
|
Owner: Trinity River Authority of Texas
Project: MC-4A Interceptor Rehabilitation
Contract Amount: $10,600,000
Project Highlights: 8,300 feet of 54-inch HOBAS; 700 feet of 72-inch Tunnel; 54-inch Aerial Pipeline Crossing; 30,000 feet of double-barrel 24-inch and 30-inch HOBAS; Pump Station (over 60-feet in depth)
|