Approximately 185,909 LF of 84" and 72" diameter steel pipe. Approximately 4,275 LF of 120" tunnel. Construction of several concrete structures that include: two weir structures, an outfall structure at Lake Lavon and installation of flow meter vault. In addition, several open cut creek crossings will be required for pipe installation.
|