This project consists of a 30 MGD water treatment plant expansion which includes a high service pump station, new flocculation, rapid-mix, sedimentation and filtration basins. Approximately 35,000 LF of utility pipe consisting of 4" and 72" diameter piping. Other facilities include Liquid Oxygen Transfer System, Ozone Generation Equipment and replacement of existing Ozone Diffusing Devices.
|