Approximately 23,500 LF of 108" concrete cylinder pipe. Approximately 125 LF of 144" diameter tunnel will also be required for a road crossing. Construction of meter vault and outfall structure to include electrical and instrumentation. This project will include purchase and handling of 3EA 108" butterfly valves, 1EA 144" butterfly and 1EA 168" butterfly Valve. This is the final phase of a water transmission pipeline that connects Lake Fork to Lake Tawakoni.
An ENR Top 400 Contractor | Ranked #1 Water and Sewage Contractor by Texas Construction | Licensed in Over 20 States
Lake Fork to Lake Tawakoni Phase Four
Location: TX
Owner: City of Dallas
Contract Amount: $31,814,686.00
Approximately 23,500 LF of 108" concrete cylinder pipe. Approximately 125 LF of 144" diameter tunnel will also be required for a road crossing. Construction of meter vault and outfall structure to include electrical and instrumentation. This project will include purchase and handling of 3EA 108" butterfly valves, 1EA 144" butterfly and 1EA 168" butterfly Valve. This is the final phase of a water transmission pipeline that connects Lake Fork to Lake Tawakoni.
« Back to Projects
An ENR Top 400 Contractor | Ranked #1 Water and Sewage Contractor by Texas Construction | Licensed in Over 20 States

HOME