Field Scale Wetlands Demonstration Project

One of the growing concerns in the Dallas/Fort Worth Metroplex is inadequate water supplies. The most typical means of increasing water supply is the construction of a water reservoir. In the case of the Tarrant Regional Water District, an increase in water supply capacity was obtained through the use of wetlands.


Elm Fork Water Treatment Plant Sludge Ponds No. A, B and C Cleaning

This project consists of sludge removal from ponds at the Elm Fork Water Treatment Plant. This work includes, earthwork, site prepration, excavation, pipe installtion, dewatering and removal of non-grass vegetation.


Bachman and Elm Fork Water Treatment Residuals Disposal Contract

Removal and disposal of 750,000 cy of residuals from Sludge Ponds A, B and C and the Lagoon 2 at Bachman WTP and Elm Fork WTP.