M-244B Emergency Sanitary Sewer

This emergency project was over 3500 lf of 36" and 42" slipline. The line being sliplined is beneath Lake Arlington in a very environmentally sensitive area.


Lake Tawakoni Pipeline Repairs

Approximately 4500 lf of 84" PCCP in over 25 locations was removed and replaced in less than 2 months. This project was an outstanding example of partnering in the best interest of the project for the engineer, owner and contractor.